Tasks: Build a Small Clay Furnace (With Tuyere)
Tech Level 1
Last edited · 92a9d6f · tewelde
Next
- (none right now)
Done
-
Add expected dry-time ranges by climate/humidity.
-
Expand the two-tuyere variant (placement, angle, when to convert).
-
Initial article draft exists.
-
Add cross-section schematic diagram.
-
Add a field test for clay mix quality before full build (coil test in Find and Prepare Clay, now a prerequisite, plus the existing fist-sized ball test).
-
Add a "Terms used in this article" section (tuyere, temper, course, bore, leather-hard, backflow, turbulence, spall).
-
Fix diagram: tuyere now penetrates the wall into the chamber.